Приказано 1-2 од 2 ставке.
Ознака стандардаФаза израдеБАС/ТКДатум реализацијеПредвиђени датум наредне фазе
  
pnBAS EN 50549-1+A1:2025
Requirements for generating plants to be connected in parallel with distribution networks - Part 1: Connection to a LV distribution network - Generating plants up to and including Type B
30.20BAS/TC 1010.03.202516.03.2025
pnBAS EN 50549-2:2024
Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network - Generating plants up to and including Type B
30.20BAS/TC 1013.05.202413.06.2024