Prikazano 1-14 od 14 stavki.
Oznaka standardaFaza izradeBAS/TCDatum realizacijePredviđeni datum naredne faze
  
prBAS EN 60127-2/A1:2025
Miniature fuses - Part 2: Cartridge fuse-links
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN 60269-6/A1:2025
Low-voltage fuses - Part 6: Supplementary requirements for fuse-links for the protection of solar photovoltaic energy systems
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 60076-22-7/Cor1:2025
Power transformers - Part 22-7: Power transformer and reactor fittings - Accessories and fittings
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 60127-1:2025
Miniature fuses - Part 1: Definitions for miniature fuses and general requirements for miniature fuse-links
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 60127-6:2025
Miniature fuses - Part 6: Fuse-holders for miniature fuse-links
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 60127-8/A1:2025
Miniature fuses - Part 8: Fuse resistors with particular overcurrent protection
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 60404-8-1:2025
Magnetic materials - Part 8-1: Specifications for individual materials - Permanent magnet (magnetically hard) materials
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 60691/A1:2025
Thermal-links - Requirements and application guide
00.99BAS/TC 1803.12.202417.12.2024
prBAS EN IEC 60691:2025
Thermal-links - Requirements and application guide
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 61558-2-10:2025
Safety of transformers, reactors, power supply units and combinations thereof - Part 2-10: Particular requirements and tests for separating transformers with high insulation level and separating transformers with output voltages exceeding 1 000 V
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 61812-1:2025
Time relays and coupling relays for industrial and residential use - Part 1: Requirements and tests
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 62314:2025
Solid-state relays - Safety requirements
00.99BAS/TC 1812.12.202417.12.2024
prBAS EN IEC 63522-8:2025
Electrical relays - Tests and measurements - Part 8: Timing
00.99BAS/TC 1803.12.202417.12.2024
prBAS IEC 60076-7:2025
Power transformers - Part 7: Loading guide for mineral-oil-immersed power transformers
00.99BAS/TC 1812.12.202417.12.2024