prBAS IEC TS 63217:2026

Utility-interconnected photovoltaic inverters - Test procedure for over voltage ride-through measurements


Opće informacije
Status:Projekt
Broj stranica:26
Metoda usvajanja:Proglašavanje
Jezik:engleski
Izdanje:1.
Nadnevak realizacije:13.11.2025
Predviđeni nadnevak naredne faze:15.01.2026
Tehnički komitet:BAS/TC 56, Konvencionalni i alternativni izvori električne energije
ICS:
27.160, Sunčeva energija

Apstrakt
IEC TS 63217:2021 provides a test procedure for evaluating the performance of Over Voltage Ride-Through (OVRT) functions in inverters used in utility-interconnected photovoltaic (PV) systems. This document is most applicable to large systems where PV inverters are connected to utility high voltage (HV) distribution systems. However, the applicable procedures may also be used for low voltage (LV) installations in locations where evolving OVRT requirements include such installations, e.g. single-phase or 3-phase systems. This document is for testing of PV inverters, though it contains information that may also be useful for testing of a complete PV power plant consisting of multiple inverters connected at a single point to the utility grid. It further provides a basis for utility-interconnected PV inverters numerical simulation and model validation.

Životni ciklus
...

Izvorni dokument i stepen usklađenosti
IEC TS 63217:2021, identičan

Radni materijal

Samo članovi tehničkog komiteta imaju pristup radnom materijalu. Ukoliko ste član, molimo prijavite se sa vašim nalogom i dobićete pristup dokumentima. Пријавите се