prBAS IEC TS 63217:2026

Utility-interconnected photovoltaic inverters - Test procedure for over voltage ride-through measurements


General information
Status:Project
Number of pages:26
Adoption method:Proglašavanje
Language:engleski
Edition:1.
Realization date:13.11.2025
Forseen date for next stage code:15.01.2026
Technical committee:BAS/TC 56, Conventional and alternative sources of electrical energy
ICS:
27.160, Solar energy engineering

Abstract
IEC TS 63217:2021 provides a test procedure for evaluating the performance of Over Voltage Ride-Through (OVRT) functions in inverters used in utility-interconnected photovoltaic (PV) systems. This document is most applicable to large systems where PV inverters are connected to utility high voltage (HV) distribution systems. However, the applicable procedures may also be used for low voltage (LV) installations in locations where evolving OVRT requirements include such installations, e.g. single-phase or 3-phase systems. This document is for testing of PV inverters, though it contains information that may also be useful for testing of a complete PV power plant consisting of multiple inverters connected at a single point to the utility grid. It further provides a basis for utility-interconnected PV inverters numerical simulation and model validation.

Lifecycle
...

Original document and degree of correspondence
IEC TS 63217:2021, identical

Work material