BAS standards at public enquiry

Institute for Standardization of Bosnia and Herzegovina, on the proposal of BAS technical committees, announces a public enquiry on draft national standards (stage code 40.20).

Deadline for submission of comments on draft national standards is 60 days from the publication of the enquiry on the Institute's website (if necessary, it can be shortened to no less than 30 days).

The drafts of BAS standards are available to our stakeholders via online module for reading the draft of BAS standards, and basic information about the draft (title, scope, technical committee that prepared the draft for public discussion, etc.) is available on the ISBIH website. 

The request for access to the draft BAS standard at the public enquiry should be sent to email: stand@isbih.gov.ba. To be able to access the online module for reading the draft BAS standards, you must be registered on our website.

Written comments on the draft national standards (with the designation of BAS technical committee and the reference designation of the BAS draft standards) shall be submitted to the Institute. 

To fill this form correctly, see the Comment Form Use Guide.

Showing 501-520 of 1,226 items.
Standard referenceStage codeBAS/TCReal dateForseen date for next stage code
   
nsBAS EN IEC 61084-2-1:2025
Cable trunking systems and cable ducting systems for electrical installations - Part 2-1: Particular requirements - Cable trunking systems and cable ducting systems intended for mounting on walls and ceilings
40.20BAS/TC 3028.04.202527.06.2025
nsBAS EN IEC 61084-2-2/A11:2025
Cable trunking systems and cable ducting systems for electrical installations - Part 2-2: Particular requirements - Cable trunking systems and cable ducting systems intended for mounting underfloor, flushfloor, or onfloor
40.20BAS/TC 3028.04.202527.06.2025
nsBAS EN IEC 61084-2-2:2025
Cable trunking systems and cable ducting systems for electrical installations - Part 2-2: Particular requirements - Cable trunking systems and cable ducting systems intended for mounting underfloor, flushfloor, or onfloor
40.20BAS/TC 3028.04.202527.06.2025
nsBAS EN IEC 61084-2-3/A11:2025
Cable trunking systems and cable ducting systems for electrical installations - Part 2-3: Particular requirements - Slotted cable trunking systems intended for installation in cabinets
40.20BAS/TC 3028.04.202527.06.2025
nsBAS EN IEC 61084-2-3:2025
Cable trunking systems and cable ducting systems for electrical installations - Part 2-3: Particular requirements - Slotted cable trunking systems intended for installation in cabinets
40.20BAS/TC 3028.04.202527.06.2025
nsBAS EN IEC 61084-2-4/A11:2025
Cable trunking systems and cable ducting systems for electrical installations - Part 2-4: Particular requirements - Service poles and service posts
40.20BAS/TC 3028.04.202527.06.2025
nsBAS EN IEC 61084-2-4:2025
Cable trunking systems and cable ducting systems for electrical installations - Part 2-4: Particular requirements - Service poles and service posts
40.20BAS/TC 3028.04.202527.06.2025
nsBAS EN IEC 61139-3:2025
Industrial networks - Single-drop digital communication interface - Part 3: Wireless extensions
40.20BAS/TC 5124.04.202523.06.2025
nsBAS EN IEC 61300-2-11:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-11: Tests - Axial compression
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-2-22:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-22: Tests - Change of temperature
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-2-26:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-26: Tests - Salt mist
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-2-27:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-27: Tests - Dust (laminar flow)
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-2-34:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-34: Tests - Resistance to solvents and contaminating fluids
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-2-38:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-38: Tests - Sealing for fibre optic sealed closures and hardened connectors using air pressure
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-2-44:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-44: Tests - Flexing of the strain relief of fibre optic devices and components
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-2-6:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-6: Tests - Tensile strength of coupling mechanism
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-3-4:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-4: Examinations and measurements - Attenuation
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61300-3-45:2025
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 3-45: Examinations and measurements - Attenuation of random mated multi-fibre connectors
40.20BAS/TC 525.04.202525.06.2025
nsBAS EN IEC 61406-2:2025
Identification link - Part 2: Types/models, lots/batches, items and characteristics
40.20BAS/TC 5124.04.202523.06.2025
nsBAS EN IEC 61439-3:2025
Low-voltage switchgear and controlgear assemblies - Part 3: Distribution boards intended to be operated by ordinary persons (DBO)
40.20BAS/TC 5223.04.202523.06.2025