prBAS ISO 11462-1:2027
Implementation of statistical process control (SPC) — Part 1: Statistical process management — Elements, tools and techniques of SPC
General information
Status:Project
Number of pages:45
Adoption method:Korice
Language:engleski
Edition:2.
Realization date:11.09.2026
Forseen date for next stage code:06.10.2026
Technical committee:BAS/TC 38, Metrology and measurements
ICS:
03.120.30, Application of statistical methods
Abstract
This document gives guidance on the implementation of a statistical process control (SPC) system and an overview of tools and techniques to assist an organisation in planning, implementing and evaluating an effective statistical process control (SPC) system.
This document specifies SPC system guidelines for use
when a supplier's capability to reduce variation in processes associated with design or production needs to be proven or improved, or
when a supplier is beginning SPC implementation to achieve such capability.
This document considers the complete industrial supply chain. It describes some essential statistical methods that can be used to continuously improve capability or performance and stability of production processes.
The bottom line is that production processes are controlled economically, promptly and effectively. As a result, a predefined level of quality can be realised. The improvement of stability and performance or capability of the production processes effectively reduces waste and machine downtime or increases productivity. If defective production parts are found in a random sample, they can be sorted out and, if necessary, further measures can be initiated.
Lifecycle
...
Original document and degree of correspondence
ISO 11462-1:2026, identical
Relation to BAS standards
Work material
Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login