prBAS IEC TR 62786-100:2027

Distributed energy resources connection with the grid - Part 100: Generating plants and units grid connection standard mapping


General information
Status:Project
Number of pages:22
Adoption method:Proglašavanje
Language:engleski
Edition:1.
Realization date:29.10.2026
Forseen date for next stage code:15.11.2026
Technical committee:BAS/TC 10, Electrical energy measurement equipment and load control
ICS:
17.220.99, Other standards related to electricity and magnetism
29.240.01, Power transmission and distribution networks in general
91.140.50, Electricity supply systems

Abstract
IEC TR 62786-100:2026 gives guidance for the drafting of IEC publications which relate, wholly or partly, to connection of distributed energy resources (DER) with the grid. Technical committees relevant to the connection of DER with grid are advised to follow the guidance given in this document when they prepare new publications and clauses relevant to the connection of DER with the grid, as well as when they revise existing publications so that consistent and harmonized standards can be delivered. Annex A, Annex B, Annex C, and Annex D list documents relevant to grid connection of DER in order to ensure that other IEC publications are consistent with these documents and to avoid overlapping each other.<br /> Table E.1 lists national and regional standards and regulations relevant to connecting DER with the grid.

Lifecycle
...

Original document and degree of correspondence
IEC TR 62786-100:2026, identical

Work material

Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login