prBAS IEC TS 63265:2026

Photovoltaic power systems - Reliability practices for operation


General information
Status:Project
Number of pages:40
Adoption method:Proglašavanje
Language:engleski
Edition:1.
Realization date:13.11.2025
Forseen date for next stage code:15.01.2026
Technical committee:BAS/TC 56, Conventional and alternative sources of electrical energy
ICS:
27.160, Solar energy engineering

Abstract
IEC TS 63265:2022 outlines methods that can be utilized to ensure reliability throughout the PVPS project phases. It is derived from a management motivation for long lasting and cost-effective energy performance, energy production, secure production and revenue, and safe function. The application of reliability practices in this document is designed to be practical and reduce the costs of unreliability. This document further identifies and defines a normative minimum set of processes and tools to meet the requirements of this document. Key objectives of this document are to inform users of reliability tools and assessment methods (historic, predictive, and analytical) that can satisfy the stakeholders needs for dependable PV Power System (PVPS) operation. This document provides a fundamental process for ensuring reliability needs can be understood and met. IEC TS 63019 addresses availability which is a higher-level metric that combines reliability and maintainability, and it complements this document as a key normative standard. It should be used in combination with this document.

Lifecycle
...

Original document and degree of correspondence
IEC TS 63265:2022, identical

Work material

Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login