prCEN ISO/ASTM TS 52949:2026

Additive manufacturing of metals - Qualification principles - Installation, operation and performance (IQ/OQ/PQ) of PBF-EB equipment (ISO/ASTM TS 52949:2025)


General information
Status:Project
Number of pages:9
Adoption method:Proglašavanje
Language:engleski
Edition:1.
Realization date:09.10.2025
Forseen date for next stage code:20.10.2025
Technical committee:BAS/TC 17, Technical drawings and symbols
ICS:
25.030, Additive manufacturing

Abstract
This document addresses installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) issues directly related to the additive manufacturing system that has a direct influence on the consolidation of material. The first three elements of process validation, process mapping, risk assessment, and validation planning, are necessary pre-conditions to machine qualification, however, they are outside the scope of this document. This document covers issues directly related to the AM equipment and does not cover feedstock qualification or post processing beyond powder removal. Physical facility, personnel, process and material issues are only included to the extent necessary to support machine qualification.

Lifecycle
...

Original document and degree of correspondence
CEN ISO/ASTM TS 52949:2025, identical
ISO/ASTM TS 52949:2025, identical

Work material

Only members of the technical committee have access to work material. If you are a members of this technical committee you need to login to view the documents. Login