| Standardization field | Electrical engineering
|
| Technical committee | BAS/TC 18- Power transformers, measuring relays and protective equipment |
| Term (EN) | bridging time |
| Definition (EN) | For a change-over make-before-break contact, the time
interval which elapses between the instant one contact
circuit is closed and the instant the other opens. |
| Term (FR) | |
| Definition (FR) | |
| Term (DE) | |
| Definition (DE) | |
| Term (BS) | vrijeme prekrivanja |
| Definition (BS) | Za preklopni kontakt bez prekidanja, vremenski
interval koji protiče između trenutka kada se jedan
kontaktni krug zatvori i trenutka kada se drugi otvori |
| Term (HR) | |
| Definition (HR) | |
| Term (SR) | |
| Definition (SR) | |
| Date | 2016-02-16 |
| Standards | BAS IEC 60050-446:2005 |
|---|