| Standardization field | Electrical engineering
|
| Technical committee | BAS/TC 18- Power transformers, measuring relays and protective equipment |
| Term (EN) | fault clearance time clearing time |
| Definition (EN) | The time interval between the fault inception and the
fault clearance. |
| Term (FR) | |
| Definition (FR) | |
| Term (DE) | |
| Definition (DE) | |
| Term (BS) | vrijeme otklanjanja kvara |
| Definition (BS) | Vremenski interval između pojave kvara i otklanjanja
kvara. |
| Term (HR) | |
| Definition (HR) | |
| Term (SR) | |
| Definition (SR) | |
| Date | 2016-02-12 |
| Standards | BAS IEC 60050-448:2005 |
|---|