| Standardization field | Electrical engineering
|
| Technical committee | BAS/TC 10- Electrical energy measurement equipment and load control |
| Term (EN) | cold start-up of a thermal generating set |
| Definition (EN) | The process by which the generating set is raised
to speed, the machine connected to the system and
loaded after a long period of being out of operation. |
| Term (FR) | |
| Definition (FR) | |
| Term (DE) | |
| Definition (DE) | |
| Term (BS) | puštanje termogeneratorskog agregata iz hladnog stanja |
| Definition (BS) | proces kojim se generatorskom agregatu povećava
brzina i koji je mehanički povezan na sistem i
opterećen nakon dugog perioda tokom kojeg nije
bio u funkciji |
| Term (HR) | |
| Definition (HR) | |
| Term (SR) | |
| Definition (SR) | |
| Date | 2016-02-05 |
| Standards | BAS IEC 60050-602:2015 |
|---|