| Standardization field | Construction
|
| Technical committee | BAS/TC 61- Design of construction structures - Eurocode 2, Eurocode 4 and Eurocode 6 |
| Term (EN) | pointing |
| Definition (EN) | process of filling and finishing mortar joints where the surface of the joint has been raked out or left open for pointing |
| Term (FR) | |
| Definition (FR) | |
| Term (DE) | |
| Definition (DE) | |
| Term (BS) | |
| Definition (BS) | |
| Term (HR) | naknadno fugiranje |
| Definition (HR) | postupak ispunjavanja i završne obrade morta nakon što je mort izgreban iz sljubnica do određene dubine ili ako je prvobitno ostavljen nezapunjen radi naknadnog zapunjavanja i fugiranja
|
| Term (SR) | |
| Definition (SR) | |
| Date | 2017-06-27 |
| Standards | BAS EN 1996-1-1+A1:2017 |
|---|