| Standardization field | Electrical engineering
|
| Technical committee | BAS/TC 8- Insulation co-ordination, high-voltage testing and instrument transformers |
| Term (EN) | associated phase layout |
| Definition (EN) | in a substation, a layout in which the conductors relating to the three phases of the same circuit are located side by side (see Figure 4a) |
| Term (FR) | |
| Definition (FR) | |
| Term (DE) | |
| Definition (DE) | |
| Term (BS) | izvedba s pridruženim fazama |
| Definition (BS) | izvedba podstanice kod koje su vodiči koji se odnose na tri faze istog kruga, postavlјeni jedan pored drugog (vidjeti sliku 4a) |
| Term (HR) | |
| Definition (HR) | |
| Term (SR) | |
| Definition (SR) | |
| Date | 2016-09-21 |
| Standards | BAS IEC 60050-605:2016 |
|---|