BAS standards at public enquiry
Institute for Standardization of Bosnia and Herzegovina, on the proposal of BAS technical committees, announces a public enquiry on draft national standards (stage code 40.20).
Deadline for submission of comments on draft national standards is 60 days from the publication of the enquiry on the Institute's website (if necessary, it can be shortened to no less than 30 days).
The drafts of BAS standards are available to our stakeholders via online module for reading the draft of BAS standards, and basic information about the draft (title, scope, technical committee that prepared the draft for public discussion, etc.) is available on the ISBIH website.
The request for access to the draft BAS standard at the public enquiry should be sent to email: stand@isbih.gov.ba. To be able to access the online module for reading the draft BAS standards, you must be registered on our website.
Written comments on the draft national standards (with the designation of BAS technical committee and the reference designation of the BAS draft standards) shall be submitted to the Institute.
To fill this form correctly, see the Comment Form Use Guide.
| Standard reference | Stage code | BAS/TC | Real date | Forseen date for next stage code |
|---|---|---|---|---|
| nsBAS HD 626-S2:2026 Overhead distribution cables of rated voltage U0/U(Um): 0,6/1 (1,2) kV | 40.20 | BAS/TC 30 | 20.04.2026 | 19.06.2026 |
| nsBAS IEC 60335-2-114/A1:2026 Amendment 1 - Household and similar electrical appliances - Safety - Part 2-114: Particular requirements for Personal-e-Transporters | 40.20 | BAS/TC 57 | 21.05.2026 | 21.07.2026 |
| nsBAS IEC 60335-2-118:2026 Household and similar electrical appliances - Safety - Part 2-118: Particular requirements for professional ice-cream makers | 40.20 | BAS/TC 57 | 21.05.2026 | 21.07.2026 |
| nsBAS IEC 61727:2026 Photovoltaic (PV) systems - Characteristics of the utility interface | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 62270:2026 Guide for computer-based control for hydroelectric power plant automation | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 62271-111:2026 High-voltage switchgear and controlgear - Part 111: Automatic circuit reclosers for alternating current systems up to and including 38 kV | 40.20 | BAS/TC 52 | 22.05.2026 | 22.07.2026 |
| nsBAS IEC 62548-1:2026 Photovoltaic (PV) arrays - Part 1: Design requirements | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 62746-10-3:2026 Systems interface between customer energy management system and the power management system - Part 10-3: Open automated demand response - Adapting smart grid user interfaces to the IEC common information model | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 62788-7-3:2026 Measurement procedures for materials used in photovoltaic modules - Part 7-3: Accelerated stress tests - Methods of abrasion of PV module external surfaces | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 62862-1-5:2026 Solar thermal electric plants - Part 1-5: Performance test code for solar thermal electric plants | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 62862-1-6:2026 Solar thermal electric plants - Part 1-6: Silicone-based heat transfer fluids for use in line-focus concentrated solar power applications | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 62862-3-1:2026 Solar thermal electric plants - Part 3-1: Systems and components - General requirements for the design of parabolic-trough solar thermal power plants | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 63092-1:2026 Photovoltaics in buildings - Part 1: Requirements for building-integrated photovoltaic modules | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC 63092-2:2026 Photovoltaics in buildings - Part 2: Requirements for building-integrated photovoltaic systems | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC TR 60695-2-16:2026 Fire hazard testing - Part 2-16: Glowing/hot-wire based test methods - Summary of the round robin tests related to the use of pyrometer for glow-wire temperature measurements according to IEC 60695-2-10 | 40.20 | BAS/TC 6 | 06.05.2026 | 06.07.2026 |
| nsBAS IEC TR 60904-14:2026 Photovoltaic devices - Part 14: Guidelines for production line measurements of single-junction PV module maximum power output and reporting at standard test conditions | 40.20 | BAS/TC 56 | 14.05.2026 | 14.07.2026 |
| nsBAS IEC TR 61857-2:2026 Electrical insulation systems – Procedures for thermal evaluation – Part 2: Selection of the appropriate test method for evaluation and classification of electrical insulation systems | 40.20 | BAS/TC 8 | 20.05.2026 | 20.07.2026 |
| nsBAS IEC TR 61912-1:2026 Low-voltage switchgear and controlgear - Overcurrent protective devices - Part 1: Application of short-circuit ratings | 40.20 | BAS/TC 52 | 22.05.2026 | 22.07.2026 |
| nsBAS IEC TR 61912-2:2026 Low-voltage switchgear and controlgear - Over-current protective devices - Part 2: Selectivity under over-current conditions | 40.20 | BAS/TC 52 | 22.05.2026 | 22.07.2026 |
| nsBAS IEC TR 62063:2026 High-voltage switchgear and controlgear - The use of electronic and associated technologies in auxiliary equipment of switchgear and controlgear | 40.20 | BAS/TC 52 | 22.05.2026 | 22.07.2026 |